## Cross-quarter narrative

In the 2026 Q2 call, Soluna reported 145% year‑over‑year revenue growth and expanded its renewable‑powered AI pipeline to 6.3 GW. The company acquired the 150 MW Briscoe Wind Farm and raised $159 M, deploying capital to acquire assets, retire preferred stock, and fund the AI pipeline. Visibility improved through index inclusion and new sell‑side coverage. However, margins were pressured by front‑loaded site costs and wind‑farm repairs. Management highlighted execution talent and team building as the top risk for delivering AI campuses, alongside long‑lead electrical equipment availability, ERCOT audit uncertainty around data‑center loads, reliance on energized wind farms and grid interconnections, and the need for project‑level debt and equity partners to fund large AI builds. Several milestones were marked delivered (Briscoe Wind Farm acquisition, Series B preferred stock) while others remain on track (Kati 1, Kati 2 joint venture, Dorothy 3 land purchase, AI pipeline expansion). Potential delays were noted from equipment supply chains, ERCOT audit and interconnection approvals, and substation upgrades at Las Majadas expected early next year.

## Latest CallCard · Q2

Soluna reported 145% YoY revenue growth, expanded its renewable‑powered AI pipeline to 6.3 GW, acquired a 150 MW wind farm and raised $159 M, while highlighting execution and equipment risks.

**Guidance:** maintained — Management maintained its outlook, outlining planned project milestones without adjusting prior guidance.

**Tone:** mgmt 0.8 · Q&A pressure 0.6 · divergence 0.2

Management highlighted strong revenue growth, pipeline expansion and capital formation, conveying optimism.

### Demand visibility

Improved visibility via index inclusion and new sell‑side coverage

Added to the Russell 3000/2000 indices and attracted fresh sell‑side research, enhancing institutional visibility while AI power demand underpins pipeline growth.

### Margins / costs

Margins pressured by front‑loaded site costs and wind‑farm repairs

Gross profit fell 35% YoY as new site expenses and $1.5 M turbine repairs at Briscoe offset hosting gains, while cost of revenue includes site depreciation.

### Capital allocation

Capital deployed to acquire assets, retire preferred stock, and fund AI pipeline

$51.4 M to Briscoe Wind Farm, $25.3 M to buy out Dorothy 1 partners, $13 M CapEx, $45.3 M cash retained; Series B converted and dividends paid.

### Milestones

- **Briscoe Wind Farm acquisition** [delivered]: Closed acquisition on April 1 for $53 M, providing direct renewable generation.
- **Kati 1** [on_track]: Delivered first positive gross profit; Phase 3 (14 MW) construction ahead of schedule.
- **Kati 2 joint venture** [on_track]: Signed definitive JV with Metrobloks, design development near completion, long‑lead equipment ordered.
- **Dorothy 3 land purchase** [on_track]: Secured definitive land purchase agreement and advanced utility coordination and master planning.
- **Series B preferred stock** [delivered]: Converted all shares, paid accumulated dividends and withdrew the series.
- **AI pipeline expansion** [on_track]: Pipeline grew to 6.3 GW with 192 MW operating, 14 MW under construction, 1.6 GW in planning.

### Fears / risks

- **Execution capability**: Management cites execution talent and team building as the top risk for delivering AI campuses.
- **Equipment supply chain**: Long‑lead electrical equipment availability is a known risk that could delay construction.
- **Regulatory audit**: ERCOT audit of data‑center loads introduces uncertainty about future interconnection approvals.
- **Power availability**: Reliance on energized wind farms and grid interconnections could be constrained if upgrades lag.
- **Capital raising**: Funding large AI builds requires project‑level debt and equity partners; raising capital remains a focus.
- **Mining revenue volatility**: Proprietary Bitcoin mining loss grew due to a 34% drop in hash price from $51 to $34 per MWh.
- **Wind‑farm maintenance costs**: Briscoe Wind Farm incurred $1.5 M turbine repairs and posted a gross loss, impacting margins.
- **Market demand for AI capacity**: Future AI tenant commitments are still in LOI stage, creating demand uncertainty.

### Key quotes

> “Power is the primary constraint in the AI era -- not chips, not capital -- power and how quickly you can reach it.”

> “Kati 1 delivered its first positive gross profit this year. Site moves from capital consumption to cash generation exactly once, and this is the quarter Kati 1 did it.”

> “Both campuses have access energy. Both campuses are already energized as part of the previous investments we've made in grid integration.”

> “We raised $159.4 million in the second quarter and an additional $23.6 million on our ATM program since quarter end, issuing about 18.8 million shares.”

## Quarter one-liners

- **2026 Q2:** Soluna reported 145% YoY revenue growth, expanded its renewable‑powered AI pipeline to 6.3 GW, acquired a 150 MW wind farm and raised $159 M, while highlighting execution and equipment risks.

## Theme arcs

- **Revenue growth** (improving): 145% YoY revenue growth reported
- **AI pipeline expansion** (improving): Pipeline expanded to 6.3 GW
- **Renewable asset acquisition** (improving): Acquired 150 MW Briscoe Wind Farm
- **Capital deployment** (improving): Raised $159 M, retired preferred stock, funded AI pipeline
- **Margin pressure** (deteriorating): Front‑loaded site costs and wind‑farm repairs pressuring margins
- **Execution risk** (new): Management cites talent and team building as top risk for AI campuses
- **Equipment supply chain risk** (new): Long‑lead electrical equipment availability could delay construction
- **Regulatory uncertainty** (new): ERCOT audit of data‑center loads introduces interconnection approval uncertainty
- **Power availability risk** (new): Reliance on energized wind farms and grid upgrades may constrain capacity
- **Capital raising focus** (stable): Project‑level debt and equity partners needed for large AI builds

## Fear persistence

- **Execution capability** [new]: Management cites execution talent and team building as top risk for delivering AI campuses
- **Equipment supply chain** [new]: Long‑lead electrical equipment availability could delay construction
- **Regulatory audit** [new]: ERCOT audit of data‑center loads introduces uncertainty about future interconnection approvals
- **Power availability** [new]: Reliance on energized wind farms and grid interconnections could be constrained if upgrades lag
- **Capital raising** [new]: Funding large AI builds requires project‑level debt and equity partners; raising capital remains a focus

## Guidance path

2026 Q2:maintained

---