## Cross-quarter narrative

Across eight quarterly CallCards, NextEra Energy’s narrative shifted from emphasizing a strong Q3 2024 backlog build and storm‑resilience to a broader focus on regulatory outcomes, capital intensity and emerging technology risk. Early calls highlighted a growing renewables pipeline (3 GW Q3 2024, 25 GW Q4 2024) and low‑cost storage, while later quarters added sizable capex commitments ($120 B four‑year plan, $40 B investment plan, $12‑13 B FY2026 FPL spend) and a concrete large‑load target (8 GW by 2032). Regulatory uncertainty remained a constant thread, moving from rate‑case timing to tax‑credit phase‑outs and PJM market rules. Gas‑turbine price spikes and EPC labor shortages evolved from a cost‑pressure note to a recurring delay factor for gas‑peakers and transmission projects. Nuclear risk progressed from “at‑risk” licensing to an on‑track restart with a Google PPA, yet cost and SMR commercial‑terms uncertainty persisted. Data‑center siting opposition and competition from small developers entered the discourse in 2025‑2026, reflecting a widening exposure to policy and market dynamics despite continued demand visibility across regulated and contracted segments.

## Latest CallCard · Q2

NEE delivered strong Q2 with $1.15 adj. EPS, raised FPL large load target to 8 GW by 2032, added 3.6 GW to Energy Resources backlog, advanced Dominion merger filings, and maintained 2026 EPS guidance of $3.92-$4.02 targeting high end.

**Guidance:** maintained — 2026 adjusted EPS range $3.92-$4.02 unchanged, targeting high end; 8%+ CAGR through 2032 and 2035 off 2025 base of $3.71; dividend growth ~10%/yr through 2026 then 6%/yr through 2028.

**Tone:** mgmt 0.8 · Q&A pressure 0.4 · divergence 0.4

Prepared remarks emphasize confidence, excitement, and strong execution across FPL and Energy Resources, highlighting 'opportunity set has never been clearer' and 'merger of addition, not subtraction.'

### Demand visibility

Strong visibility from FPL customer growth (90k added in Q2), 21 GW large load interest (12 GW advanced discussions), Energy Resources backlog of 35.1 GW, and recontracting at $20/MWh premium.

FPL retail sales up 0.6% weather-normalized; Florida GDP growth #1 nationally. Energy Resources added 3.6 GW to backlog (2 GW storage), backlog covers ~2/3 of 2026-2029 development midpoint. Recontracted 1,100 MW YTD at 15-year avg terms. Four origination channels targeting 15 GW base case (30 GW upside) large load by 2035.

### Margins / costs

FPL non-fuel O&M >70% better than industry average; Energy Resources origination returns trending up; recontracting at significant premium to realized pricing.

FPL typical residential bill ~30% below national average, projected 2% annual increase. Non-fuel O&M >70% better than industry on $/MWh. Energy Resources seeing higher returns on larger, more complex projects requiring vertical integration. Recontracting priced ~$20/MWh above recent realized pricing.

### Capital allocation

FPL CapEx $12-13B for 2026; $46B interest rate hedging; supply secured through 2029; dividend growth 10% through 2026 then 6% through 2028; Dominion merger expected H2 2027 close.

FPL Q2 CapEx ~$2.8B. Energy Resources secured solar panels through 2029, battery storage domestic supply through 2029, wind sites with permits through 2029, transformer capacity through decade. $2.25B shareholder-funded bill credits for Dominion customers near-term. Merger expected to support ~11% annual regulatory capital employed growth through 2032.

### Milestones

- **FPL solar and storage deployment** [on_track]: Placed 4 new solar sites in Q2; on track for ~900 MW solar and >1.4 GW battery storage full year.
- **NextEra Energy Transmission New Mexico line** [delivered]: Energized 137-mile 345 kV line ahead of schedule and on budget; projected to reduce residential bills ~$13/month by 2031.
- **MISO 765 kV transmission projects (Illinois)** [new]: Selected as part of consortium with 43% ownership of ~$1.6B project to serve as Midwest backbone.
- **Energy Resources renewables/storage backlog additions** [delivered]: Added 3.6 GW in Q2 (2 GW battery storage); backlog now ~35.1 GW after 1.1 GW placed in service.
- **Renewables recontracting** [on_track]: Recontracted >500 MW since last call, YTD >1,100 MW at ~$20/MWh premium, 15-year avg contracts.
- **Duane Arnold nuclear recommissioning** [on_track]: On track for Q1 2029 restart; Iowa Utilities Commission approved generating certificate; acquired final 30% minority interest.
- **Gas-fired generation development (TX/PA)** [on_track]: Up to 9.5 GW in development; President approved projects in March; progressing discussions with US and Japanese governments.
- **SMR evaluation and co-location** [new]: Evaluating OEMs; 6 GW co-location opportunities at nuclear sites; developing greenfield sites; requires right commercial risk-sharing.

### Fears / risks

- **Federal hub agreement timing**: Definitive agreements with US and Japanese governments for 9.5 GW gas-fired projects progressing but not yet complete; timing uncertain.
- **Community pushback on data centers**: Local opposition risk in Florida (e.g., Project Tango in West Palm Beach) could affect siting and speed of large load development.
- **Nuclear cost overrun risk**: SMR development requires commercial structures that cap NextEra's exposure; first-of-a-kind risk with multiple 'wallets' needed (customer, government, OEM, EPC).
- **Dominion merger regulatory approvals**: Requires approvals from Virginia SCC, NCUC, SC PSC, FERC, NRC; statutory 6-month review in Virginia; shareholder votes in September.
- **Interest rate environment**: Managed via $46B hedging program but remains a macro risk to financing costs.
- **Trade and supply chain impacts**: Potential tariff/trade impacts mitigated by secured supply through 2029 for solar, storage, wind, transformers.
- **Large load execution risk**: Converting 12 GW advanced discussions into signed transactions under FPL tariff by year-end.
- **FERC show cause orders market shift**: Section 206 orders may reshape load-generation matching requirements, creating both opportunity and uncertainty.

### Key quotes

> “We believe FPL's opportunity set has never been clearer, a rapidly growing service area, a disciplined and constructive regulatory framework, scale complemented by a best-in-class operating model and a long runway of investment”

> “This is a merger of addition, not subtraction. The rare example of when 1 plus 1 equals 3.”

> “Our 2026 adjusted earnings per share expectations range of $3.92 to $4.02 remains unchanged, and we are targeting the high end of that range.”

> “I would characterize it as we feel like we're ahead of schedule. And when I look at the second half of the year and beyond, shaping up very well.”

> “Our timing hasn't changed, Carly, from where the negotiations are to where we're looking for those projects to come online.” — Brian Bolster

## Quarter one-liners

- **2026 Q2:** NEE delivered strong Q2 with $1.15 adj. EPS, raised FPL large load target to 8 GW by 2032, added 3.6 GW to Energy Resources backlog, advanced Dominion merger filings, and maintained 2026 EPS guidance of $3.92-$4.02 targeting high end.
- **2026 Q1:** NextEra Energy reports strong Q1 2026 earnings, rising demand and robust capex plans, while noting labor, permitting and nuclear technology risks.
- **2025 Q4:** NextEra Energy reported 8% EPS growth, a new FPL rate agreement, a 30 GW backlog and data‑center hub pipeline, while noting regulatory, PJM and SMR uncertainties.
- **2025 Q3:** NextEra Energy posted strong Q3 results, highlighted a $40B 4‑year investment plan, a nuclear restart with Google, and robust renewable and storage backlog growth amid regulatory and permitting uncertainties.
- **2025 Q2:** NextEra Energy reported strong Q2 results, highlighted accelerating demand, robust capex and backlog, while noting regulatory, permitting and tax‑credit uncertainties that could affect execution through 2029.
- **2025 Q1:** NextEra Energy delivered a solid Q1 2025 with 9% EPS growth, highlighted strong renewable demand, low tariff exposure, $50B capital plan and leadership transitions while noting gas‑plant cost pressures and policy risks.
- **2024 Q4:** NextEra Energy reported strong 2024 results, highlighted $120B four‑year capex plan, new GE Vernova gas‑generation JV, a growing renewables backlog and ongoing nuclear licensing work, while noting cost pressures on gas turbines and regulatory rate‑case timing.
- **2024 Q3:** NextEra Energy posted strong Q3 results, added 3 GW to its renewables backlog, highlighted robust demand, storm resilience and ongoing nuclear and framework agreement opportunities.

## Theme arcs

- **Renewables backlog growth** (improving): Backlog expanded from 3 GW Q3 2024 to >35 GW by Q2 2026
- **Regulatory and policy uncertainty** (deteriorating): Rate‑case timing, tax‑credit phase‑out, OBBB changes and PJM rules repeatedly flagged
- **Gas‑turbine cost pressure** (stable): Tripling of turbine prices noted Q4 2024 and persisted as a cost driver
- **Labor/EPC constraints** (stable): Skilled‑labor shortages cited Q4 2024, Q1 2025 and Q2 2026 affecting gas and transmission builds
- **Nuclear restart/SMR risk** (new): Moved from at‑risk licensing to on‑track Duane Arnold restart with Google, but SMR commercial risk remains
- **Capital intensity** (improving): Capex plans grew from $120 B four‑year outlook to $46 B hedging program and $12‑13 B FY2026 FPL spend
- **Data‑center and large‑load exposure** (new): Visibility from large‑load pipeline and opposition risk surfaced Q4 2025 onward
- **Interest‑rate environment** (deteriorating): Higher financing costs noted Q4 2024, Q1 2025 and again Q2 2026 despite hedging
- **Competitive pressure from small developers** (new): Risk of safe‑harbor tax‑credit loss mentioned Q2 2025 and Q4 2025

## Guidance path